Back to Notes

W01–W04 Archive — Mar 18–Apr 12, 2026

W01–W04 Archive (Mar 18 – Apr 12, 2026)

Condensed record of Weeks 01–04. Individual week files deleted. New plan starts W05 = Apr 27.


Plan Pivot — Apr 17, 2026

Old multi-track approach (AWS cert + Go + LangChain + Blog + DSA + SD) abandoned.

Dropped permanently:

  • AWS MLA-C01 cert → do after job switch, no company tests certs in interview
  • Go mastery track → existing Ch1–11 notes are enough as a talking point
  • LangChain deep dive → AskTGE experience is sufficient
  • Blog / vectorbuilds.dev → after offer in hand

New focus: 7 interview topics only DSA → System Design → SQL → API Design → FastAPI → LLD → Python internals

Apply date moved up: Jun 1 (was Jul 18). Don't wait for perfect prep.


DSA Completed W01–W04

PatternProblemsStatus
Arrays & HashingLC 121 + warm-ups✅ W01
Sliding WindowLC 3, 424, 567, 76✅ W01
Two PointersLC 125, 167, 15, 11, 42, 904, 1004 (7 problems)✅ W02
Binary SearchLC 704, 74, 153, 33, 875, 981 (6 problems — LC 4 skipped)✅ W04

Total: 4/12 patterns. ~18 problems done.


System Design Completed W01–W04

ProblemStatusNotes
URL Shortener✅ Notes existW02 — full design, Mermaid + Excalidraw, tradeoffs
All others❌Not started

URL Shortener notes exist but NOT at interview-ready level yet. W05 task: whiteboard cold.


Other Tracks W01–W04

TrackStatus
AWS IAM✅ W01
AWS S3✅ W02
AWS EC2⚠️ Surface notes only — not reviewed in depth
Go Boot.dev✅ Ch1–11 done (W02 sprint — ahead of plan)
LangChain L1✅ W01
Layrs.me M1✅ W01
Blog❌ Never started — dropped from plan

Week Summaries

W01 (Mar 18–22)

Theme: Sliding Window + IAM + Plan launch Study hours: ~10 (vs 28.5 target). Comic Con Sat killed deep work day. Win: Momentum started. All 4 SW problems done. IAM + Go Ch1 + LangChain L1 + Layrs M1 done.

W02 (Mar 23–29)

Theme: Two Pointers + S3 + URL Shortener Study hours: ~10 (Mon–Fri = 0, Sat–Sun only). Win: All 7 Two Pointers done. URL Shortener full design complete. Go Ch1–11 sprint. Miss: LangChain, Gaurav Sen, EC2 depth.

W03 (Mar 30–Apr 5)

Theme: Stack (planned) — disrupted Metrics never filled. Carries from W02 compounded. No verifiable output.

W04 (Apr 6–12)

Theme: Binary Search DSA: 6/7 done (LC 4 Median Two Arrays skipped — hard). Everything else (AWS, SD, Go, LangChain, Frontend, Blog): ❌ not done. Apr 17: Plan pivot triggered after realizing multi-track approach was unsustainable.


Break: Apr 13–26

Two weeks off. W05 restarts Apr 27.