Interview Prep Dashboard
Interview Prep Dashboard
The one file to open. Everything else is reference โ this is the daily-use view. Updated after every retro/scorecard.
๐ฏ Interactive web version: https://claude.ai/code/artifact/8f287e7a-d0e4-48ff-8e45-73a9ffe7e07e โ pace gauges, expandable weekly problem checklists, month tabs, SD progress. Honest caveat: checkbox state saves via browser localStorage only (this browser/device, doesn't sync, doesn't write back to the vault) โ it's a fast interactive view, not a new source of truth. Tell Claude what you solved and ask it to regenerate this after each retro; the vault files below remain authoritative.
Today โ Wed 2026-07-29
- 1 Backtracking problem: Subsets (LC 78) โ 20 min target, timer on, solo
- 1 Backtracking problem: Combination Sum (LC 39) โ 25 min target
- Read next unread section of SD Concepts (mark it in [[Interview Prep/System Design/index]] as you go)
This Week โ Backtracking (Jul 29 โ Aug 4)
Full problem table + timer targets: [[Interview Prep/Weekly Tracker/Week 06 RESTART (Jul 29โAug 4) โ Backtracking]]
- 9/9 DSA problems solved on time
- SD Concepts: finish the unread half
- SD problem: Twitter Feed (next after URL Shortener)
- Sun Aug 2: actually run the retro and update this file + Coach Hub โ this is exactly the step that silently stopped happening for 4 weeks last time
Where things actually stand (verified 2026-07-28, not vibes)
| Track | Status |
|---|---|
| DSA | Patterns 01-09 done (Arrays/Hashing โ Tries+Heap), all PASS STRONG through W05. Backtracking onward = 0 done, restarting today. ~58 problems solved, ~80 remain. |
| System Design | Concepts folder โ half read, exact stopping point unmarked (use the checkboxes in [[Interview Prep/System Design/index]] going forward). Problem designs โ URL Shortener only (Alex Xu book), 6 more queued (Twitter Feed, WhatsApp, Google Docs, YouTube, RAG & LLM System, ML Feature Store). |
| Redis playlist | Started (notes + build-your-own topic list), not tracked week-by-week |
| DDIA | Ch1, Ch2 complete. Ch3+ not started. |
| Applications | 0 sent. Deferred to apply phase per Jun 21 decision. |
| Resume | Last touched โ check Resume/ folder for the latest version before first screen |
Draft restart schedule (v1 โ NOT finalized, flagging for your pain points)
Same pattern sequence as before (nothing skipped), redated from today. This is a straight-line 7-week plan at the original ~11 problems/week pace โ I have not tried to compress it further or cut scope, because that's a real trade-off decision, not mine to make silently.
| Week | Dates | DSA (count) | SD problem |
|---|---|---|---|
| 06 RESTART | Jul 29 โ Aug 4 | Backtracking (9) | finish Concepts + start Twitter Feed |
| 07 | Aug 5 โ 11 | Graphs (13) | Twitter Feed |
| 08 | Aug 12 โ 18 | Adv Graphs + Greedy (14) | |
| 09 | Aug 19 โ 25 | 1-D DP (12) | Google Docs |
| 10 | Aug 26 โ Sep 1 | 2-D DP (11) | YouTube |
| 11 | Sep 2 โ 8 | Intervals + Math & Geometry (14) | RAG & LLM System |
| 12 | Sep 9 โ 15 | Bit Manipulation (7) + weak-patch | ML Feature Store |
End of DSA/SD sprint under this draft: ~Sep 15, 2026 โ one month later than the original Aug 15 target.
The tension this creates, stated plainly: apply phase (resume polish, referral DMs, 75 applications, mocks, interview loops, negotiate, close) would compress from the original ~12-13 weeks (mid-Aug โ Nov 11) down to ~8 weeks (Sep 15 โ Nov 11). That's on top of the 90-day HCLTech notice period already flagged as making Nov 11 tight even under the original schedule (offers were already projected to realistically land closer to Dec). This draft makes that worse, not better.
Options I see, not deciding for you:
- Hold the pace, slip the target โ Nov 11 becomes informally "Dec-ish," matches the notice-period math anyway.
- Compress the DSA pace โ more problems/week to hold Sep 15 or earlier. Real question: is 11/week actually the ceiling, or was the W06-W10 stall about something else (motivation, distraction, wrong problems) that a faster pace wouldn't fix either.
- Cut scope โ fewer SD problems, or drop weaker DSA patterns, to protect the apply-phase runway.
- Start applying now, DSA/SD in parallel โ breaks the "no apps during sprint" rule from Jun 21, but that rule was set when the sprint was still on track.
This is exactly where I want your pain points before I lock anything in.
Quick links
- [[Interview Prep/Coach]] โ full historical scorecard log + current state
- [[Interview Prep/Main Plan]] โ strategy, hours budget, funnel math
- [[Interview Prep/Content/index]] โ all study material, one folder
- [[Interview Prep/Job Switch/index]] ยท [[Interview Prep/Behavioral & Past Projects/index]]
- [[Interview Prep/Weekly Tracker]] ยท [[Interview Prep/Resume]]
/coach statusfor a live pull of this same data from chat