Back to Notes

Pre-May 11 Weekly Tracker Summary (Archived)

Pre-May 11 Weekly Tracker — Archived Summary

Captures intent + planned content from the 10 weekly tracker files + RAG blog draft archived on May 12, 2026.


Past Weeks (status before archival)

W01–W04 (Mar 18–Apr 12) ✅

Completed per Weekly Progress Tracker:

  • Arrays, Two Pointers, Sliding Window, Binary Search
  • Already had separate W01-W04 Archive (Mar 18–Apr 12).md file (kept, not archived here)

Break: Apr 13–26 ❌

Two-week break, no DSA work.

W05 | Apr 27–May 3 — Planned but unconfirmed

Theme: Linked Lists + URL Shortener + SQL Start

  • DSA: Linked Lists (LC 206, 21, 143, 19, 138, 2, 141, 287) — 8 problems
  • SD: URL Shortener whiteboard cold
  • SQL: HackerRank SQL Basic (SELECT, WHERE, GROUP BY, JOINs) — 15 problems
  • Resume polish + send to 2 reviewers

W06 | May 4–10 — Planned but unconfirmed

Theme: Trees + Rate Limiter + SQL Window Functions

  • DSA: Trees DFS/BFS, path sum, LCA, level order — 10+ problems
  • SD: Rate Limiter (token bucket vs leaky, Redis sliding window)
  • SQL: ROW_NUMBER, RANK, DENSE_RANK, LAG, LEAD — 15 problems

W07 | May 11–17 — Carry-heavy

Theme: Tries + Notification System + DSA/SD catch-up

  • DSA new: Tries (LC 208, 211, 212)
  • DSA carry W06: Trees (LC 226, 104, 543, 110, 100, 572, 235)
  • DSA carry W05: Linked Lists
  • SD new: Notification System (fan-out, Kafka, SNS/FCM, DLQ)
  • SD carry: URL Shortener + Rate Limiter
  • SQL: ✅ Done
  • Resume polish + send

Future Weeks (planned, never executed)

W08 | May 18–24

Heap + API Gateway + FastAPI Start + Python Internals

  • Heap: kth largest, merge k sorted, task scheduler (6+ problems)
  • API Gateway: auth, rate limiting, circuit breaker, service discovery
  • FastAPI: async routes, DI Depends, middleware, background tasks
  • Python: GIL, async/await, context managers, decorators

W09 | May 25–31

Backtracking + RAG & LLM System + LLD Start

  • Backtracking: subsets, permutations, N-queens, word search (7+ problems)
  • SD: RAG & LLM System (AskTGE maps here)
  • LLD: SOLID + Strategy + Observer + Factory + LRU Cache
  • FastAPI: Build complete API w/ JWT + DI + background task + tests

W10 | Jun 1–7 — Application start (old plan)

Graphs + YouTube + LLD Mid + 🚀 FIRST APPLICATIONS

  • Graphs: DFS/BFS, union-find, topological sort, Dijkstra (8+ problems)
  • SD: YouTube/Netflix (transcoding, CDN, adaptive bitrate)
  • LLD: Rate Limiter class + Parking Lot
  • APPLY: Sarvam AI (3 open roles) + Krutrim — Tier 1 first
  • LinkedIn "Open to work" + AskTGE added

W11 | Jun 8–14

1D DP + WhatsApp + LLD Complete + Backend Project

  • 1D DP: coin change, house robber, climbing stairs, word break
  • SD: WhatsApp (WebSocket, Cassandra, message ordering)
  • LLD: Splitwise + Event Emitter
  • Backend: FastAPI + PostgreSQL + JWT auth + 1 real feature
  • Apply: Razorpay, PhonePe, CRED — 5 more

W12 | Jun 15–21

2D DP + Uber/Maps + Mock LLD + Backend 50%

  • 2D DP: LCS, edit distance, unique paths, knapsack
  • SD: Uber/Maps (geohash, driver matching, ETA)
  • LLD: Mock LLD round
  • Backend: 50% — schema + core APIs
  • Apply: BrowserStack, Zepto, Juspay, Swiggy — 5 more
  • Resume locked

W13 | Jun 22–28

Stacks + Google Docs + Backend Deployed + Mock Interviews

  • Stacks: monotonic, next greater, largest rectangle
  • SD: Google Docs (OT vs CRDT, op log)
  • Backend: Deploy to AWS (live URL on resume)
  • 1 DSA mock + 1 SD mock
  • Apply: 5 more = 20+ total

Interview Sprint Template (W14+)

  • 30+ applications
  • 5+ active loops
  • Debrief after every interview, fix gaps
  • Salary research on Levels.fyi
  • Don't stop applying till offer signed

Phase 3 (W18–W22) — Offers + Negotiation

  • Don't accept first offer, use as leverage
  • Counter w/ competing offers (even verbal)
  • Floor ₹42 LPA, target ₹50–65 LPA
  • Notice period buyout negotiation

Phase 4 (W23–W25) — Close + Transition

  • Offer signed, notice period, handover, references

RAG in Production — Blog Draft (archived)

Blog post draft on RAG. Plan was to publish to vectorbuilds.dev. Killed in revised plan (no blog work until post-offer). Original draft existed at Project_2026/Blog/RAG in Production Draft.md — see git history for content if needed.


Why archived

All weekly trackers above were built on the old Mar 18 → Sep 18 plan numbering. Revised plan starts May 11, 2026 = W1 (validation gate). Old W07 = new W1, W08 = new W2, etc. — but content tracks (Tries / FastAPI / LLD / Backend project / RAG SD problem) don't match revised single-track focus (NeetCode + SD + behavioral + apply only).

Revised plan source of truth: Private/Project_2026/Coach/ — auto-updates per session.

Original Running Scoreboard (Apr 26)

MetricTargetCurrent as of Apr 26
DSA patterns fluent124 (Arrays, Two Pointers, Sliding Window, Binary Search)
SD problems interview-ready100
LLD problems coded cold50
SQL problems done30+0
Applications sent30+0
Interviews completed10+0
Offers received2–30